← Home

What working with MRT involves

An MRT engagement is scoped around the capability the business needs. The work may include processes, systems and technology, with training and adoption so the agreed capability works in practice.

Start with diagnosis

The Business Assessment gathers information about the business, its gaps, their consequences and implementation readiness. MRT applies its qualification criteria before proceeding into deeper assessment.

For suitable engagements, the process moves through diagnosis and a Capability Report, a review session, an implementation recommendation and a proposal. An enquiry begins with capturing the request and a qualification call.

Agree what will be implemented

The assessment informs the implementation recommendation and scope. Components make that scope concrete: accounting, procurement, inventory, production, CRM, reporting or workflow automation may form part of an engagement.

Standard implementation covers 3–5 defined components within a maximum of two active business structures. The selected components and acceptance criteria are agreed for the engagement.

Implementation: ₦750,000 per month

The minimum implementation period is three months. More components mean a longer implementation period; the standard monthly rate does not increase simply because scope becomes larger.

The agreed implementation period reflects the work required. A three-month minimum is not a promise that every engagement will be completed in three months.

What the scope may include

Depending on the selected components, implementation may include:

  • Process and workflow design, policies and SOPs.
  • Software configuration and system integration.
  • Automation and custom development within agreed limits.
  • Data, reporting, user roles and controls.
  • Training and implementation support.

Costs outside the standard implementation

Third-party licences, hosting, hardware, paid APIs and substantial custom development outside the standard component blueprint are separate. The proposal should make the relevant scope and costs clear.

Your team participates

A decision-maker participates in discovery and sign-off. The business assigns an internal implementation owner and provides access to the people, records and current processes needed for the work.

Management must be prepared to improve weak processes where necessary. Training and adoption are part of making the capability usable, rather than leaving the business dependent on an installation alone.

Complete means working in practice

A component is complete when the agreed business capability is working in practice, users are trained, required workflows are operational and the client can use the system as intended.

Ongoing support: ₦300,000 per month

Support begins after implementation and covers the systems and capabilities implemented by MRT. The minimum support period is six months.

Support may include troubleshooting, user support, minor configuration changes, small improvements, workflow refinements, documentation updates, adoption support and periodic reviews. Major new capability implementations require a new implementation cycle.

Start with your business.

Identify the gaps, their business consequences and what should be fixed first.

Take the Business Assessment ↗Make an Enquiry →